PIAC made a submission to the AEMC’s ‘Material change in network infrastructure project costs – draft determination’ (the Draft). The...
PIAC responded to the PADR for the Queensland to NSW Interonnector (QNI) upgrade Regulatory Investment Test for Transmission (RIT-T). PIAC...
PIAC responded to TransGrid’s consultation as part of the Regulatory Infrastructure Test for Transmission (RIT-T) for the project to reinforce...